Mon – Fri: 9:00 – 17:00
+ 30 2310 465898

Amfipolis west & southwest

PROJECT DESCRIPTION

Amfipolis west: Part of the ‘Amfipolis’ complex, consisting of three 5-storey, 8500 m2 buildings of 50 luxury apartments, coming with indoor individual parking spaces. Stores of 80, 100 and 150 m2 and a common 1000 m2
underground parking lot are also included.

The plot occupies a total area of 2000 m2 and faces three streets, along which the buildings evolve, forming a ‘Π’. The surroundings accommodate the ramps that lead to the outdoor parking spaces and the underground parking lot, as well as to green areas with ornamental plants. Completion time 12 months.

Amfipolis south-west: Opposite the block 441 lies block 444, another part of the ‘Amfipolis’ complex, consisting of four buildings attached with each other and evolving along the block’s perimeter that faces three roads, forming a ‘Π’.
The buildings include 70 luxury residences of 13000 m2 total area, 100, 120, 150, 200 and 300 m2 sized and coming with individual indoor parking spaces, individual warehouse and a common 2000m2 underground parking lot of 50 seats. The two corner stores occupy 100 and150 m2 respectively,
their facade greened with ornamental plants. Completion time 12 months.

  • Clean and modern architecture
  • Eco friendly materials
  • Idea to final solution

PROJECT BACKERS

The complexity and the size of the project require the coordination of a large team of engineers and construction workers.

  • Oikodomi S.A.
  • Σ.ATHANASIADIS&CO